钢结构工程施工过程没有按照钢结构设计人员同意改动的危害
Hazards of steel structural engineering construction not changed according to the consent of steel structure designer
在钢结构工程施工设计、安装过程中,发现设计图纸中出现错误或不清楚的问题,施工技术人员不经设计单位同意,凭经验擅自随意改动设计图纸。这样有可能出现对设计人员的设计意图(如构件的重要性、特征、荷载大小、结构形式、应力状态、连接方法、工作环境等)没有完全理解,就改变钢结构设计,容易出现错误,从而导致达不到设计要求,降低构件的安全度和使用寿命或出现重大质量事故。
In the process of construction design and installation of the steel structural engineering, if errors or unclear problems are found in the design drawings, the construction technicians will change the design drawings at will without the consent of the design unit. This may result in incomplete understanding of the design intent of the designers (such as the importance, characteristics, load size, structural form, stress state, connection method, working environment, etc.), leading to changes in the steel structure design and errors, resulting in failure to meet design requirements, reduced safety and service life of the components, or major quality accidents.
防治措施
Prevention and control measures
在钢结构工程施工设计、安装过程中,技术人员不得随意修改设计图纸。对设计图中的尺寸错误,零件尺寸、使用材料等在几张图中不一致,或材料不易购买,加工精度达不到,或自认为焊缝高度太大,材料选用过于保守
During the construction design and installation of the steel structural engineering, the technicians shall not modify the design drawings at will. Incorrect dimensions in the design drawings, inconsistent dimensions of parts, materials used, etc. in several drawings, difficulty in purchasing materials, inability to achieve machining accuracy, or self perception that the weld height is too large and the material selection is too conservative